We have two DP9.06 cell managers, one at siteA and one at siteB. We backup via catalyst to a Storeonce 4700 at siteA then we use DP object copy replication jobs (ARS) to replicate to the 4700 at SiteB and the foreign cell at siteB.
SiteB DP cell will then do an object copy to physical tape for vaulting purposes.
I would like to understand why the "objects" feature "include only objects with number of copies less than" is greyed out. This is a real pain because we normally use a 24hr timeframe. If we have to move times around then we have to adjust the timeframe so we dont lose anything.
Will we ever get this tick box for replication jobs??