Hi Bob,
Thanks for the reply.
While migrating the CM from windows 2003 32 bit to windows 2008 64 bit; I will be installing DP with trial license of 60 days. Right? Then I will go for migrating the CM from 2003 to 2008.
Can you please share the steps to migrate the DP.
After migration I can upgrade the DP6.21 to DP9 with trial license directly?
If my upgradation to DP 9 fails unistall DP install DP 6.21 and move the
Program Files -> Omniback -> db40
Program Files -> Omniback -> Config -> Server
to original location.
Regards,