Hello,
In such case, I perform a post backup script that :
- Check if the backup is full or inc
- Launch a "dummy backup" that will execute a post backup script with the copy specification that is suitable (daily export to tape and/or weekly export to tape)
However, for the timeframe I set it in the copy specification. It is set based on the greatest run time recorded.