Hi everyone, hope that someone will be able to help me (don't want to open a request for that if we can save them time).
So, I planned to moved on the new version of the scheduler, the advanced one, which looks nice.
First thing I saw, no link between the default scheduler and the advanced, we need to recreate all schedule, am I right so far ?
Also, when I'll have planned the new schedules, there should be two option reguarding the old one:
- Deleting all schedules from the old system
or
- Check "Disabled schedule" then apply.
In the second case, is the advanced scheduler still work ? (I mean, if I disable the old system, I still the in the Adv. sched that it's enabled).
And the last question, we have actually 3 type of object copy, all set manually.
- One is doing a copy on tape every weeks on tuesday, excluding the last Tuesday of the month (1 week protection)
- One is doing a copy on tape every last tuesday of each months, excluding the last of the year (1yr protection)
- One is doing a copy on tape every last tuesday of the year (3yr protection)
So, I see that we can set the "last X of Y" in the advanced scheduler, but didn't find a way to make some exlusion, is this option exist ?
Maybe that can be a feature request if it's not.
Thanks for yours answers :)
Edit: I saw this, but this post has 8 months back, maybe some news on it^^